I'm trying to achieve situation when master build starts build of 2 following configurations (A and B). Problem is I need those 2 configurations to run on same machine one after another (simultaneously is not an option). I've tried to define one unit of specific resource on this machine and then create following configurations:
Configuration A
*some_step
*composition_sequentional_step(reuqiring resource YY)
[
some_step_123
some_step_144
]
Configuration B
*some_step
*composition_sequentional_step(reuqiring resource YY)
[
some_step_123
some_step_144
]
Unfortunetaly it doesn't work as both configurations seems to get into infitie loop of trying to request one resource (grid management says that one of those configurations is using it, but this same configuration says that it want and cannot access this resource). I've already read this tutorial http://wiki.pmease.com/display/QB60/Exc ... Deployment but unforunetaly it uses a resource for only 1 step (i need steps 123 and 144 to be executed one after another with no other steps from other configurations to be executed in meantime).